• English
    • Nederlands
    • Deutsch

Search

  • Solutions
    • Improving efficiency
      • Augmented reality
      • Production automation
      • MES, MOMS
      • OEE
      • Model Predictive Control
    • Safer production
      • Machine safety
      • Explosion safety
      • NEN 3140 inspections
      • Food safety
      • Data protection
    • Sustainable production
      • Energy monitoring
      • Power quality
      • Energy management
    • Customer care
      • Migration of outdated control systems
      • Maintenance
      • Support during malfunctions
      • Spare parts
  • Segments
    • Food / Feed
    • Water
    • Machine building
    • Infrastructure
    • Chemical industry
  • About us
    • Batenburg Techniek N.V.
    • Mission, Vision
    • Organisation
    • Services
      • Consultancy
      • E&I Engineering
      • Mechanical Engineering
      • Software Engineering
      • Panel building
      • Service
      • Industrial Installation
    • Datell
      • Datell Mercurius
      • Datell Mercator NX
    • References
    • Partners
      • Solution Partners
      • Strategic partners
    • Terms of Delivery
    • CSR
      • CO2 Performance
    • Certification
  • Contact
Back to project archive
Home » WWTP De Groote Zaag

WWTP De Groote Zaag

HHSK

Project description

Together with Aan de Stegge (Civil and Mechanical), the Sewage Plant is renovated and the hydraulic capacity extended from 2.550 m3/h to 3.050 m3/h. The rebuilding is carried out is two phases. During the first phase the complete mechanical and electrical installations are replaced, plus new buildings for the headworks, two return sludge pumping stations and a combined blower/energy building. The existing Aeration basins renovated and modified. Beenen is responsible for the complete electrical and control installations. During phase two, in about ten years time, the aeration basins will be replaced by new basins. The point of departure is that civil structure built during phase 1, are also usable in phase 2.

Scope of supply

The following solutions and services are delivered by Beenen:

Oplossingen:
Improving efficiency

Diensten:
Industrial Installation
Panel building
E&I Engineering

Implementation period

  • Implementaion: 2013-2014
  • Delivery date : december 2014

Characteristics

  • Controlsystem: ABB 800xA

 

Contact

Meer informatie over dit project?
Alex van Dalen
Alex van Dalen
Algemeen directeur
a.van.dalen@beenen.nl
0513 - 46 95 00

Our solutions

Improving efficiency
Safer production Sustainable production Customer care
Food - FeedMachine buildingWaterInfrastructureChemical industry

Vacancies

Unfortunately are our vacancies only available in Dutch.

Contact

Heerenveen  +31 51 - 346 95 00
Zwolle           +31 38 - 426 12 80
Nijkerk          +31 33 - 247 88 08

A Batenburg Techniek company
© Batenburg Techniek - 2021
Webdesign: Heers
  • Privacybeleid
  • Solutions
    • Improving efficiency
      • Augmented reality
      • Production automation
      • MES, MOMS
      • OEE
      • Model Predictive Control
    • Safer production
      • Machine safety
      • Food safety
      • Explosion safety
      • NEN 3140 inspections
      • Data protection
    • Sustainable production
      • Energy monitoring
      • Power quality
      • Energy management
    • Customer care
      • Migration of outdated control systems
      • Maintenance
      • Service
      • Spare parts
      • Support during malfunctions
  • Segments
    • Food / Feed
    • Machine building
    • Infrastructure
    • Water
    • Chemical industry
  • About us
    • Batenburg Techniek N.V.
    • Mission, Vision
    • Organisation
    • Services
    • Datell
    • References
    • Partners
      • Strategic partners
      • Solution Partners
    • CSR
    • CO2 Performance
    • Certification
  • Contact